Parma House,
Tottenham

Project Scope: Construction of 70 Studio apartments, one- and two-bedroom

Job Duration: 66 weeks

 

Talk to us Find Out More

Parma House, Tottenham

A residential development comprising 70 studio, one- and two-bedroom apartments. The project is programmed over a 66-week duration, delivering high-quality accommodation through carefully planned and managed construction phases to ensure efficiency, safety and a timely completion.

Parma House, located in Tottenham, is a former HMRC building undergoing conversion into a modern residential development. The scheme comprises 70 studio, one- and two-bedroom apartments, forming part of a carefully planned redevelopment designed to deliver high-quality accommodation. The project is programmed over a 66-week duration, with construction phases strategically managed to ensure efficiency, safety, and timely completion.

As part of the redevelopment, Gorilla Scaffold has provided comprehensive access solutions to support the structural and lift installation works throughout the building. This has included the erection of approximately 150 metres of perimeter scaffold to the full building, constructed in accordance with design specifications and current safety standards. Fully boarded lift access platforms with compliant lift heights have been installed to enable safe and efficient installation of lift systems, alongside riser access platforms and working areas formed specifically for lift shaft cut-outs. 

Parma House

Works Completed:

  • 150m perimeter scaffold erected to the full building
  • Fully boarded lifts with 2m lift heights
  • Scaffold constructed in accordance with design specifications
  • 50m protection fan installed above neighbouring car park
  • 10m gantry installed for safe access and protection
  • Debris netting fitted to all working lifts
  • Internal handrails installed throughout
  • Riser access and working platforms formed for lift shaft cut-outs
  • Birdcage scaffolds and internal handrails installed

Project Duration: 56 weeks

Get in touch

Gorilla Scaffolding Limited

Unit 5,

Masters Court,

Lyon Road,

Harrow,

Middlesex

HA1 2BT

Thank you for your enquiry.

Send us your details and we’ll be in touch shortly.

Thank you for your enquiry.

Send us your details and we’ll be in touch shortly.

Gorilla Scaffolding

Unit 5,

Masters Court,

Lyon Road,

Harrow,

Middlesex

HA1 2BT

t. 0345 835 8142

m. 07825 636576

e.info@gorillascaffold.com

Site Map

Services

Case Studies

Insights

News

Privacy

Contact

We’re Social!

LinkedIn Facebook Instagram

© Gorilla Scaffolding Limited 2026

  • Small Business Template

Website by Devstars